Yesterday TEPCO reported
Unit 2(Shut down)
- Reactor has been shut down and Reactor Core Isolation Cooling System has
been injecting water to the reactor. Current reactor water level is lower
than normal level, but the water level is steady. After fully securing
safety, we are preparing to implement a measure to reduce the pressure of
the reactor containment vessels under the instruction of the national
government.
The BBC has now reported that TEPCO is planning to pump seawater into Unit 2 at the plant - this is the first time serious cooling problems have been reported with this reactor. This is also a BWR/4 Mark 1 type reactor. It went on line in 1974.
Comments