The BS 1192 suite of guidelines and best practices developed under the auspices of the BSI, the national standards body of the UK, are designed to help the UK construction industry adopt BIM Level 2 and applies to both building and infrastructure assets. These standards target 33% savings over the full life-cycle of a building or infrastructure asset. BSI has announced that beginning this year the BS 1192 British standards will become international ISO standards.
An introduction to BIM Level 2 for folks for whom BIM is new can be found here.
BS 1192 (2007 + 2016)
The principles for information sharing and modelling of BIM Level 2 are outlined in this standard. BS 1192 provides a ‘best-practice’ method for the development, organization and management of production information for the construction industry and provides the template for common naming conventions and approaches to collaborative working for use in architecture, engineering and construction. It is also designed to assist efficient data use in facilities management.
Will be replaced in 2018 by;
"BS EN ISO 19650–1 Organization of information about construction works – Information management using building information modelling – Part 1: Concepts and principles."
PAS 1192-2 (2013)
PAS 1192-2 focuses on project delivery, specifically, the graphical data, non-graphical data and documents that are accumulated from design and construction activities.
Will be replaced in 2018 by;
"BS EN ISO 19650-2 Organization of information about construction works – Information management using building information modelling – Part 2: Delivery phase of assets."
PAS 1192-3 (2014)
PAS 1192-3 addresses the recognition that the cost of operating and maintaining buildings and facilities can represent up to 85% of the whole-life cost of a facility. PAS 1192-3 provides guidance to asset managers on how to integrate asset management during operations and maintenance with the accumulation of information about assets during design and construction. The UK government has targeted cost savings of 33% across the entire life-cycle of a facility by implementing the processes outlined in PAS 1192-2 and PAS 1192-3.
Will be replaced in 2020 by;
"BS EN ISO 19650-3 Organization of information about construction works – Information management using building information modelling – Part 3: Operational phase of assets."
PAS 1192-5 (2015)
PAS 1192-5 outlines the cyber-security vulnerabilities to hostile attack when using BIM and provides an assessment process to determine the levels of cyber-security for BIM collaboration which should be applied during all phases of the life-cycle.
Will be replaced in 2020 by;
"BS EN ISO 19650-5 Organization of information about construction works – Information management using building information modelling – Part 5: Specification for security-minded building information modelling, digital built environments and smart asset management."
The announcement by the BSI did not include two other parts of the suite;
- BS 1192 4 (2014) outlines the UK usage of COBie, an internationally agreed information exchange schema for exchanging facility information between the employer and the supply chain.
- BS 8536-1 (2015) aims to involve the operator of the facility from the outset by documenting building performance requirements early in the design phase to ensure that designers design for optimum performance of a facility.
Comments